What did our clients need?
A solution which was economically sound, a design which met with their application and site requirements, project support which acknowledged the strengths of their in-house expertise.
What we provided for them.
We provided our expertise through diagnosis and evaluation, designing solutions for their cooling tower application.
Our track record speaks for itself.
We have provided many turnkey operations, including:
- Cooling Tower Manufacturing (Custom)
- Plant Equipment design
- Pump sizing & selection
- Plumbing installation
- Light engineering
What distinguishes our assembly process?
Lakeside’s unique design features, incorporated in all its towers, allow assembly and installation of all equipment quickly and efficiently, ensuring clients lose as little operational time as possible. The MA range, in particular, normally requires site assembly time of between 4 hours and one day.
Some of our latest projects
- Westgate Tunnel – Melbourne
- Bourke Shire Council
- Puratos Australia
- Laurent bakery
Call us today for an obligation free quote
Telephone: +61 03 9543 1129